Thanks to Upstate Medical University, the future of this caring campus has new potential. Upstate and Community General are planning to become a single hospital this year, and Upstate is in talks with Onondaga County, Van Duyn's owner.


A sign of progress at Community this week is the construction crane outside the Emergency Department. The crane is working on the Center for Orthopedics, which is under construction on the sixth floor.
In September 2006, the state promised a $12.8 million grant to help Community and Van Duyn comply with the Commission. The grant contract has yet to be completed in Albany, although we are hopeful that final signatures will be forthcoming before year end. Completion of the grant contract will set the stage for the $7.6 million renovation of our sixth floor, starting in 2009. We will create a new, 40-bed acute care unit on that floor, with mostly private rooms. The Certificate of Need (CON) application for the sixth floor renovation was filed with the Department of Health this fall.
assisted surgeries in urology and gynecology during August. The start-up of robot surgery here was described as “astounding” by Po Lam, MD, Medical Director of Robotics, in a recent address to the Medical Staff. “It is pretty astounding," he said, "to establish a completely new robotic program without the glitches and the pitfalls typical of a start-up.” We have had a significant number of robot-assisted surgeries already, characterized by minimal blood loss, short stays, and good outcomes. One year after becoming law, New York’s landmark experiment in mandated hospital closures, mergers, and restructuring is proceeding as planned. In fact the majority of affected hospitals and nursing homes are meeting or exceeding the June 30, 2008 deadline, according to state Health Commissioner Richard Daines.With Van Duyn, Community's mandate is to downsize nursing home beds and to coordinate medical planning. In association with Onondaga County we have responded directly.
Special thanks are due to our sixth floor management and employees for the professional and sensitive ways they have worked with residents during this disruptive and sometimes heart-wrenching process.1. The ownership of Van Duyn Home & Hospital will not change. That meets the County’s core requirement.
2. CGH and the County are in the process of forming a new corporation to coordinate campus development and plan clinical care capacity between the two organizations. CGH will have four members on the board of this company, and the County will have three members – this is consistent with the intention of the Berger Commission.
3. Another positive is the availability of some $12.8 million in state funds to help Van Duyn make improvements on its resident care units, to fund planning for the new corporation, and to retrofit CGH’s sixth floor for acute care patients. The sixth floor will be redesigned and reconstructed with advanced patient safety features and amenities for hospital patients.
I am thankful for the capable and compassionate staff who have taken care of my [parent] on the sixth floor….We will miss them when we are forced to move [my parent]. (Original emphasis.)I sincerely regret the disruption, the upset, and the sadness occasioned by the closure of our skilled nursing unit.
This morning’s Post Standard reports the allocation of $12.8 million of New York State HEAL NY funds for Community General Hospital and Van Duyn Home and Hospital. These funds will be used to comply with the requirements of the Berger Commission. I’ve written before about the Berger Commission.
The funds are necessary because the Berger Commission requires the affiliation of CGH and Van Duyn. These changes are part of a larger state plan affecting 74 institutions – the closure of nine hospitals and seven nursing homes, plus changes in the affiliations or bed configurations of another 48 hospitals and 14 nursing homes.
The state’s decision to fund changes at CGH and Van Duyn comes after many months of dialogue between CGH and Onondaga County, the operator of Van Duyn. County Executive Nick Pirro and his staff fought diligently for the affiliation scenario called “A,” under which the County would continue to own and operate Van Duyn. Scenario “B” would have involved the more complex and more costly process of transferring the ownership of Van Duyn to CGH. Both Onondaga County and the Civil Service Employees Association (CSEA) sued New York State to prevent such a change in ownership.
Our discussions with the County have been straightforward and cordial throughout this process. We have also had a number of discussions with the state, and these too have been helpful. The state remained noncommittal about scenarios “A” and “B” until about 5:00 p.m. last Friday, September 28, when it faxed the announcement of its grant allocation to the County and to CGH.
Although the state has not formally accepted scenario “A,” the funds it has allocated are based on the costs identified for “A” – so “A” appears to be the de facto decision of the state. Here is a summary of what the scenario “A” affiliation involves:
The state funds will reimburse Onondaga County and CGH for the legal and planning costs incurred in complying with the Berger Commission. The funds will also cover the transition costs involved in closing CGH’s 50-bed long term care unit, they will fund the planning work of the OHC, and they will fund facility renovations at both CGH and Van Duyn that are consistent with the Berger Report.
Changes for nursing home residents can be disruptive and stressful. That means we need careful plans for the closure of CGH’s sixth floor skilled nursing unit. These plans have yet to be developed, and they too will be subject to approval by the State Health Department. We are committed to assuring that transitions for residents and their families are fair and respectful.
Of CGH’s 1,200 employees, about 50 will be affected by the closing of the sixth floor long term care beds. These employees may be eligible for positions elsewhere in the hospital, and we expect some may transition to Van Duyn or other community long-term care facilities. We will do our best to communicate fully with employees and to work with SEIU1199 in assuring fair and respectful transition opportunities.
You’ll notice I’ve used the word “allocation,” not “award,” in describing the HEAL NY funds. That’s because there are a number of steps to be completed before the state money is actually awarded and paid. These steps include state approval of a work plan and the sign-off by the Office of Comptroller, among other things.
The state’s decision to fund compliance comes 10 months after the Commission issued its report. It is a necessary step. It is a positive step. But it isn’t the end of the process – only the beginning.
Onondaga County residents have a compelling right and need to know exactly what is being proposed and exactly how much it will cost.
As we know, Onondaga Hill was selected and CGH opened here on January 1, 1963. The hospital has been known for this distinctive green and wooded campus ever since, thanks to the community planners. A circle of trees is the hospital’s logo.
ave more than 300 women and men who volunteer their time and talent, helping in many ways to make us “more than medicine.” Among their helpful activities are the flower beds volunteers maintain in the park outside the hospital’s several entrances.“Van Duyn Home and Hospital and Community General Hospital’s (CGH’s) Skilled Nursing Facility be joined…under the control of Community General Hospital, and downsize their combined number of RHCF (residential health care facility) beds by approximately 75” (p.103).I’ve written about the Berger Commission before. See the previous posts: What the Berger Commission said, I wrote about ‘right-sizing’ before the Berger Commission, and Q&A on CGH & Van Duyn.
its opening and well into its first decade. In today's terminology, Mr. Calagaris would have been called Community's “chief operating officer.”
Patient rooms were designed in dormitory style (with beds against the walls), rather than a more conventional hospital-style (with the beds extending into the rooms). This had the effect of reducing the square footage of each room, saving construction costs and creating a less institutional feel. But the dormitory style was controversial at the time. While Community Hospital was still in the design phase, Mr. Calagaris recalls that two prototype rooms were constructed in the S-3 building at Van Duyn to demonstrate how the dormitory-style rooms would work. Doctors and nurses visited the rooms and tried them out before accepting the dormitory style. Beds and equipment of several manufacturers were tested by the original staff in those prototype rooms.Community General Hospital